Our
References
At Akfa Global, we pride ourselves on delivering exceptional projects and solutions across various industries. Our portfolio showcases successful collaborations with clients and partners worldwide, and our references reflect our commitment to quality, innovation, and long-term relationships. Below are some key references that highlight our expertise:
TURNKEY MEDIA CENTER
This huge complex is one of the biggest media centers in the world. The challenge was to integrate systems and set new standards in control, orchestration and delivery. This included unique features such as the world’s largest permanent external LED video walls.
THE AKFA SOLUTION
An extraordinary approach performed flawlessly, exceeding expectations in an extremely challenging timeframe. The quality of the installation was fast and smooth. Cutting edge technology was applied so that a future-proof production environment was established successfully. Not only the newest and best quality products and solutions were delivered, but we also provided an exceptional project team who remained on site to materialize an impressive media facility. Last minute design and contract changes on the part of the customer created usage and timeline tensions for the end users. However commissioning, training and handover of this huge media complex was so professionally planned and executed that customer concerns ended in deep satisfaction for a job well done. The experience of our
hard-working technicians and engineers proved all the difference.
LOCATION
Astana, KAZAKHSTAN
VALUE TO THE CLIENT
All work was completed on time and on budget. We remain on-site with the service and maintenance of equipment on a day-to-day basis. Various systems installed in different sections of this huge media facility needed months of intensive training for a substantial number of people. Our staff created specialized programs and schedules to meet the many end user needs. All these successes have helped the Astana Media Centre set new global standards for integrated systems in ICT, broadcasting and multimedia.
COMPLETED
2011
OLYMPIC COMPLEX TECHNOLOGIES
Built on an area of 1.466.400 sqm in Ashgabat, Turkmenistan, the new Olympic Complex with its high-tech facilities will play host to the 2017 Asian indoor and Martial Art Games (AIMAG). Started in 2010 and designed in 3 phases, the project is aiming for completion in 2016. Major structures planned within the first phase of the project were completed on a 679,269 sqm area of the grounds in April 2014.
THE AKFA SOLUTION
The Olympic village is expected to have a significant position in the world sports community and the Central Asian sports community. Ashgabat had been awarded the Asian indoor and Martial Arts Games in 2017 and this has now become the key focus of the project.
Akfa Global provided broadcast and broadcast IT systems for the Ashgabat Olympic Complex including complete systems for the indoor velodrome, training halls, indoor arenas and other venues. With our expert project team from Istanbul, Kazakhstan and Turkmenistan, the project has been designed and installed according to the broadcast requirements of the 2017 Asian indoor and Martial Arts Games.
LOCATION
Ashgabat, KAZAKHSTAN
VALUE TO THE CLIENT
Future-proofing with high-end technologies provided for this project have been customized to the event requirements which will take place in 2017. The whole system is interconnected and able to expand in the future as well. Event operations support is also provided by AKFA as well as planned comprehensive system tests before and during the events.
COMPLETED
2016
TURNKEY EVENT SOLUTION & MEDIA CENTER
“Istanbul Lütfi Kırdar” (ICEC) is located at the point where the worlds of business, culture and art meet. This venue has been rendering services to its guests since 1996 with an experienced staff and up-to-date technological infrastructure. “Istanbul Lütfi Kırdar” in the heart of the Congress Valley, has the capacity to host all kinds of organizations from conventions to fairs, concerts and exhibitions within its
sunlit halls and stunning views overlooking the Bosphorus.
THE AKFA SOLUTION
ICEC was launched on the 17th October, 2009 assuming the mantle as the largest and newest convention center in Europe. ICEC hosted its first large-scale gathering with the World Bank Group and IMF Annual Meetings on the 6th and 7th October, 2009. AKFA Technology has designed, delivered and installed all broadcast infrastructure and systems within the guidelines and demanding specifications of the state TRT consultancy.
LOCATION
Istanbul, TURKEY
VALUE TO THE CLIENT
The well-designed AV and Broadcast systems infrastructure at ICEC has become the benchmark by achieving the highest standards in the region. Thanks to these top quality solutions, ICEC successfully hosted the World Bank Group and IMF Annual Meeting. AKFA also provided on-site services during the conferences including staff training and preparation.
COMPLETED
2011
FULLY INTEGRATED HOSPITAL SOLUTION
Located to the east of the Qassim airport (3.5 km), south of the Qassim University and adjacent to the NGHA Saudi Arabia National Guard (SANG) extended housing development project, the Qassim site covers an area of 1,339,000 sqm.
THE AKFA SOLUTION
The outstanding project team of Akfa Global implements the project respecting a very tight schedulein accordance with our fully integrated contracting solutions approach. We provide the highest quality products and state-of-the-art technology in order to create an environment of the future. Our experts put all their experience and project management skills to address all the concerns of the client and maximize satisfaction.
LOCATION
SAUDI ARABIA
VALUE TO THE CLIENT
Akfa Global will deliver fully integrated MEP, ELV, BMS, ICT and Medical Services to our client. The project will be completed on schedule and remain within the budget. Our solutions include day-to-day equipment servicing and maintenance.
COMPLETED
2015
TRT Istanbul A and B studios are the biggest and most frequently used studios on the TRT Ulus premises. ARI Studio is famous for its music shows and programs. Many generations of Turkish families have watched TRT shows broadcast from this facility.
∙ 2008 – Installed Studio Sefaretler in Ankara, the first HD Studio in TRT
∙ 2009 – Installed Production, Newsroom, Playout Automation at TRT Turk; the first 16:9 TRT Channel
∙ 2009 – Installed Istanbul Studio D
∙ 2010 – Installed Documentary Channel at TRT Izmir
∙ 2011 – Installed 78 NLE Suites, later extended to 96
∙ 2014 – Installed ARI Studio in Ankara, the first complete 3G Production Studio of TRT
∙ 2014 – Installed Istanbul A and B Studios
∙ 2014 – Installed Istanbul Master Control Center
LOCATION
İstanbul, TURKEY
VALUE TO THE CLIENT
The trend and the advanced capability of this non-conventional, IP based system is all about “sharing”. In the new workflow, the data and the signals can be shared and stored throughout the system. As the router is the heart of the broadcast structure, our new heart can not only supply video and audio signals but much, much more.
NRT TV is one of the biggest news stations in Iraq. NRT TV is broadcast live from the Iraq Kurdistan Local Government Management area in Suleymaniyah City. NRT TV is a multilingual channel that is being simultaneously broadcast in Kurdish, Arabic and English. NRT TV also
boasts a large global news network with editorial offices in key regions.
THE AKFA SOLUTION
NRT TV partnered with Akfa Global on their initial launch and chose us again as a turnkey solution supplier for their HD transformation. We not only supplied the automation and NRCS systems for NRT HD but also supplied all the compatible HD broadcasting equipment. We furbished all the equipment for two studios used primarily for daily programs and talk shows as well as equipping a third dedicated news broadcast studio. The audio and video monitors, mixers, intercom systems, studio cameras and automation software for two MCRs and a PCR were installed and integrated by AKFA specialists. Dalet software combined with MAM Systems has added up to powerful automation solutions for NRT TV.
VALUE TO THE CLIENT
Akfa Global finalized the installation and commissioning of the system according to a plan laid out by both sides at the beginning of the project. When NRT HD went live on-air before the agreed deadline and without a hitch, our customer was more than impressed. The timely and professional work by AKFA Teknoloji facilitated the first broadcast of NRT HD from 20 different locations worldwide beating all deadlines crucial to the launch of the new channel.
COMPLETED
2013
Emaar Turkey has launched the official sale of high quality residence units in “Emaar Square” the new mixed use development in Çamlıca, on the Asian side of İstanbul spanning 57,000 sqm of residences plus 500.000 sqm of parking lot & mall.
PROJECT NUGGET
Akfa Global implements a comprehensive set of electromechanical works of this large settlement comprising 1,000 residences, İstanbul’s largest shopping and recreation center, an office area of 40,000 sqm and a 5-star hotel.
LOCATION
İstanbul, TURKEY
SERVICES PROVIDED
Residences: COMPLETE MEP + ELV [HVAC Automation, Low Voltage System, Security Systems (Access Control, CCTV, Fire Alarm, Public
Address),Communication Systems (SMATV, Telephony, Data), Lighting Automation]
Carpark + Mall: COMPLETE ELECTRICAL & ELV [Medium Voltage System – 80MVA, Low Voltage System, Security Systems
(Access Control, CCTV, Fire Alarm, Gas Alarm, Public Address), Communication Systems (SMATV, Telephony, Data),
Energy Management, Lighting Automation, HVAC Automation]
COMPLETED
2017
TOTAL CONSTRUCTION AREA
122 km / 11 Stations
LOCATION
Doha, QATAR
COMPLETED
2019
TOTAL CONSTRUCTION AREA
29.380 sqm, 20 Mansions
LOCATION
Bodrum, TURKEY
WILL BE COMPLETED IN
2025
The first post-war healthcare contract in Libya, Leh Hospital will become a medical landmark. The project will be completed in a very short period of time.
PROJECT NUGGET
Akfa Global designed multifaceted solutions in order to overcome the local shortages and infrastructure challenges problems and deliver a top-quality turn-key project.
LOCATION
Benghazi, LIBYA
SERVICES PROVIDED
(HVAC, Plumbing, Sanitary, Fire Fighting & Fire Alarm Systems, Electrical, ELV and Medical Systems)
COMPLETED
2014
This is a large, 660.000 sqm turn-key solution covering of closed area including 53 buildings for 2014 Sochi Winter Olympics.
PROJECT NUGGET
Akfa developed a complex set of end-to-end solutions for this huge project with low voltage systems and building technologies.
LOCATION
Sochi, RUSSIA
SERVICES PROVIDED
IP CCTV Surveillance System, Fire Detection and Alarm System, Public Address and Voice Alarm System, Access Control & Intrusion Alarm System (Card and Biometrics), ELV Building Integration System, IPTV & DVB-C TV Headend and Distribution System, IP Intercom and Door Entry System, IP Central Clock System, Congress and Simultaneously Interpreter System, Professional Audio and Visual System, Data and Wi-Fi Network System, IP Telephony – Dect Telephony System, HVAC Mechanical Automation System, Meter Automation, Hotel Room Automation, Parking Management and Billing Systems
COMPLETED
2013
The Riyadh King Khalid International Airport serves as the gateway to Saudi Arabia’s largest city and is located 35 km north of Saudi Arabia’s capital city Riyadh. The project covers an area of 120,000 sqm.
PROJECT NUGGET
Akfa developed a robust plan within a very tight schedule and rapidly completed this large-scale project. Every solution incorporated ins seamlessly integrated.
LOCATION
Riyadh, Kingdom Of Saudi Arabia
SERVICES PROVIDED
Complete HVAC
Plumbing, Sanitary & Fire Fighting Systems
Electrical, ULV Systems, BMS, ICT & Data Solutions
COMPLETED
2016
This library in Astana, Kazakhstan, covers an area of 28.000 sqm.
LOCATION
Astana, Kazakhstan
SERVICES PROVIDED
Plumbing
Ventilation
BMS
COMPLETED
2014
AKFA Technology delivered the first HD production studio in Kyrgyzstan to the city of Bishkek.
THE AKFA SOLUTION
The project covered all the requirements for an HD studio with turnkey audio, video and lighting systems.
VALUE TO THE CLIENT
Panasonic AG-HPX500 with Studio Camera System Configuration. For-A HVS-350HS 1.5 M/E Production Switcher with Canon lenses and Sachtler camera support systems.
Soundcraft VI4/72 Digital Audio Console. Clearcom Eclipse Pico Intercom with wireless expansion. Evertz Glue Equipments. Edius NLE stations. Harris, Snell, Sony, Panasonic, Aja, TVLogic products to complete the video system.
Genelec, Sennheiser, Shure, AKG, Electrovoice, Sonifex, Tascam, TC Electronic products completed the audio system. Lighting, dimmer and curtain systems employ Arri and ADB systems combined with peripheral equipment.
COMPLETED
2012
Mall of İstanbul is the largest shopping center in İstanbul with a closed area of 450.000 sqm.
LOCATION
Istanbul, TURKEY
SERVICES PROVIDED
Heating and Cooling Systems
Plumbing
Fire Fighting Systems
HVAC Works
BMS
COMPLETED
2014
Koru Florya is a large, luxury residential project in Florya, İstanbul. The 200.000 sqm project includes 298 properties, a shopping center, recreational facilities, parking lots and other facilities.
LOCATION
Istanbul, TURKEY
SERVICES PROVIDED
Heating and Cooling Systems
Plumbing
Fire Fighting Systems
HVAC Works
BMS
COMPLETED
2014
TOTAL CONSTRUCTION AREA
53.250 sqm
TOTAL APARTMENTS
808
LOCATION
Istanbul, TURKEY
COMPLETED
2023
This is a thorough and high-security facility completed for the US Embassy in Yemen. The facility covers an area of 38.000 sqm.
LOCATION
Sana’a, Yemen
SERVICES PROVIDED
Complete HVAC
Complete Fuel systems (Gasoline+Diesel)
Plumbing,
Sanitary Systems
Fire Fighting Systems (Nicet II Certified)
COMPLETED
2015
This hotel and holiday resort in Yalta, Ukraine covers an area 60.000 sqm.
LOCATION
Yalta, Ukraine
SERVICES PROVIDED
Complete HVAC
Plumbing
Sanitary System
Fire Fighting
COMPLETION TIME
2015
This is a big, 60.000 sqm campus project.
LOCATION
Astana, Kazakhstan
SERVICES PROVIDED
Complete HVAC
Plumbing,
Sanitary Systems
Fire Fighting Systems
BMS
COMPLETION TIME
2011
This is a 120.000 sqm project located in Kağıthane, İstanbul.
LOCATION
Istanbul, TURKEY
SERVICES PROVIDED
High Current & Low Current
MV
Ventilation & Plumbing
Fire Fighting Systems
Heating and Cooling Systems, BMS
COMPLETED
2016
Akfa Global was responsible for a section of 160.000 sqm out of the total 246.000 sqm area.
LOCATION
Istanbul, TURKEY
SERVICES PROVIDED
Fire Figthing Systems
Plumbing
Ventilation Systems
COMPLETION TIME
2016
This hospital project of 35,000 sqm is located in Astana, Kazakhstan.
LOCATION
Astana, KAZAKHSTAN
SERVICES PROVIDED
Design & Build of Complete MEP Services
COMPLETED
2008
This 32.000 sqm pediatric hospital is located in Astana, Kazakhstan.
LOCATION
Astana, Kazakhstan
SERVICES PROVIDED
Design & Build of Complete HVAC
Plumbing
Fire Fighting Systems
All Electrical Systems
COMPLETED
2007
Akfa Global successfully signed on to one of the largest data virtualization projects in Turkey in 2014. The public E-Procurement platform went online using systems provided exclusively by AKFA.
THE AKFA SOLUTION
39 physical servers and disk storage units with 2100 disks spread over 12 cabinets were installed at two different locales of the Public Procurement Agency (KIK).
All the databases, virtualization systems, backup and e-mail systems for the Public E-Procurement Platform were transferred and integrated to use the new storage units.
Servers used in the old database system were moved to next generation processor servers having 1TB of memory (Dell) to provide higher speeds and greater flexibility in transactions.
VALUE TO THE CLIENT
The new data storage systems (Dell Compellent) and the existing storage systems (HP) were virtualized by an IBM SVC and were then managed from a single point via tier SAN architecture.
COMPLETED
2014
This is a fully fitted-out 42-storey building with 308 suites and 6 penthouses. The total construction area is 160.000 sqm. The project is located at the very center of the city.
LOCATION
Istanbul, TURKEY
SERVICES PROVIDED
Heating and Cooling Systems
Plumbing
Fire Fighting Systems
HVAC Works
COMPLETED
2013
Installation of complete MEP and ELV systems for the office building and headquarters.
The project is located in Ümraniye, İstanbul. The total construction area is 120.000 sqm.
LOCATION
Istanbul, TURKEY
SERVICES PROVIDED
HVAC Systems
Plumbing
Fire Fighting Systems
BMS
All High and Low Current Systems
COMPLETED
2011